Refractory linings · Anchor welding
Refractory Engineering for the World's Hottest Processes
Refractory Consultancy Services Limited installs, inspects and supervises refractory linings and anchorage for FCC units, furnaces, kilns, incinerators and boilers, through planned shutdowns and repairs.
- Refinery & FCC
- Energy from waste
- Furnaces & kilns
A selection of clients
- LUKOIL
- ENI
- Phillips 66
- Saras
- Raffineria di Milazzo
- RHI Magnesita
- Calderys
- Lafarge
- ADM
- Altrad–York Linings
01 What we do
From the anchor to the hot face.
A lining is only as good as the anchors under it and the inspection after it. We work across the whole refractory package, so each stage is done with the next one in mind.
01Refractory installation
Brickwork, hand placing, ramming, gunning and casting, with castable, ceramic fibre and insulation systems.
Scope & enquiry checklist
02Refractory inspection
Inspection of linings in reactors, regenerators, cyclones and transfer lines, and inspection during installation.
Scope & enquiry checklist
03Anchorage & welding
Anchor layout and welding: hexmesh (hexmetal), V-anchors and bullhorn anchors, and SiC tile anchorage on boiler water walls.
Scope & enquiry checklist
04Refractory consultancy
Independent advice on refractory design, material specifications, installation procedures and proposed repairs.
Scope & enquiry checklist02 Where we work
Built for plant that runs hot, and can't stop for long.
Our work centres on refinery FCC units and the plant around them. The same crews and methods serve kilns, incinerators and boilers in petrochemicals, power, cement, aluminium and steel.
A typical lining, steel shell to hot face. Every layer is in our scope.
- 01FCCU reactors & regeneratorsRefining
- 02Cyclones & transfer linesRefining
- 03HydrocrackersRefining
- 04Furnaces & rotary kilnsHeavy industry
- 05Incinerators & thermal oxidisersProcess
- 06Biomass plant & waste heat boilersPower
- 07Boiler water walls — SiC tilesEnergy from waste
BeforeAfter
03 Recent work
Thermal oxidiser: replacing only what had failed.
The lower ceramic-fibre lining had failed and a liquid sample measured pH 1. Rather than strip the whole lining, we cut back to sound fibre and relined the lower section with new ceramic modules.
- Equipment
- Thermal oxidiser
- Location / date
- Erith, Kent — May 2026
- Liquid sample
- pH 1
- Lining replaced
- Lower section (~50%), ceramic modules
Without Mr. Ramsell's direct approach to management and supervision, the turnarounds would not have progressed without substantial delays and significant safety implications.
04 Track record
Selected projects.
FCC turnarounds, repairs and inspection for refinery operators and main contractors.
- 2019 – 2024
Raffineria di Milazzo
Sicily, ItalyInspection and installation supervision on the 2019 FCCU turnaround and the 2021 shutdown, then a two-year inspection contract from 2022. Inspected a new thermal reactor at the OCS workshop in 2023, and reported on the hydrogen units, sulphur reactor and boilers in 2024.
Reference letter — view the redacted copy - 2022
LUKOIL NORSI — reactor/regenerator repairs
Kstovo, RussiaDefect inspection and refractory repairs, September–October 2022, as subcontractor to RHI Vostok Service. Completed to the required quality and on schedule.
Reference letter — view the redacted copy - 2020 – 2022
SiC tile systems on boiler water walls
Energy-from-waste plants, UK & JerseySupervision, anchor layout, welding and installation of silicon-carbide tile protection for Zampell at Jersey, Coventry, Ipswich and Teesside.
Reference letter — view the redacted copy - 2019
TOTAL Lindsey Oil Refinery — FCC turnaround
Lincolnshire, UKRefractory services for Altrad–York Linings, May–August 2019, which the client called a huge success.
Reference letter — view the redacted copy - 2018
LUKOIL NORSI — FCCU 1 & 2 turnaround
Kstovo, RussiaSupervision and management of the simultaneous turnaround of both FCC units, September–November 2018, for RHI Wostok Service. Andrew Ramsell issued the daily site reports.
Acceptance certificate — view the redacted copy

05 Who we are
A family firm that came up on the tools.
RCSL is led by Ron Ramsell, a time-served sheet metal worker and welder who has spent his career on FCCU reactors, regenerators, hydrocrackers and transfer lines. With previous employers he led the refractory installation of five new-build FCC units, and he has worked in 16 countries. Andrew Ramsell runs operations and finance. Call RCSL and you speak to the people who run the job.
- Track record
- MD: 5 new-build FCC units · 16 countries
- Company
- Refractory Consultancy Services Limited
- Incorporated
- 12 November 2015 · No. 09870178
- Based
- Thorpe-le-Soken, Essex, UK
Start a conversation
Planning a shutdown or chasing a lining problem?
Tell us the equipment, the site and your dates. We'll tell you how we can help and who will do the work.