Refractory work on FCC units, hydrocrackers, boilers and thermal oxidisers, in the UK and abroad.

Site team and palletised materials inside a large lined vessel

01 Industries

Where our linings work.

Refractory is needed wherever plant runs hot. Our installation, anchorage, inspection and consultancy work carries across all of these industries.

01

Refining & petrochemical

FCCU reactors, regenerators, cyclones and transfer lines, hydrocrackers and sulphur recovery thermal reactors.

  • FCCU
  • Cyclones
  • Hydrocrackers
  • SRU
02

Power & energy from waste

Silicon-carbide tile systems on boiler water walls, biomass plant and waste heat boilers.

  • Water walls
  • SiC tiles
  • Biomass
  • WHB
03

Cement & lime

Brick and castable linings for rotary kilns, preheaters, coolers and lime kilns.

  • Rotary kilns
  • Brickwork
  • Castables
04

Iron & steel

Installation, anchorage, repair and inspection of linings in furnaces and associated hot plant.

  • Furnaces
  • Anchorage
  • Repairs
05

Aluminium & non-ferrous

Linings for melting and holding furnaces and other high-temperature process equipment.

  • Furnaces
  • Castables
06

Glass

Brickwork, castable and insulation work on glass furnaces, regenerators and ancillary equipment.

  • Furnaces
  • Regenerators
07

Ceramics

Linings and insulation for kilns and dryers, including ceramic fibre systems.

  • Kilns
  • Ceramic fibre
08

Incineration & thermal oxidisers

Ceramic-fibre and castable linings for incinerators and thermal oxidisers, including partial relines.

  • Thermal oxidisers
  • Incinerators
09

Chemicals

Refractory-lined reactors, furnaces, boilers and sulphur plant.

  • Reactors
  • Sulphur plant
10

Pulp & paper

Linings for lime kilns, recovery boilers and other fired equipment.

  • Lime kilns
  • Boilers
11

Hydrogen & syngas

Linings and inspection for reformers, hydrogen units, transfer lines and waste heat boilers.

  • Reformers
  • H₂ units
  • WHB
12

Something else?

If it’s refractory-lined and runs hot, talk to us.

Send an enquiry

Before: deteriorated lower ceramic-fibre lining After: completed lower ceramic module lining BeforeAfter

02 Case study · 2026

Thermal oxidiser partial reline, Erith.

The lower ceramic-fibre lining had failed and a liquid sample from the unit measured pH 1. We cut back to sound lining and replaced only what had failed.

Equipment
Thermal oxidiser
Location / date
Erith, Kent — May 2026
Liquid sample
pH 1
Lining replaced
Lower section (~50%), ceramic modules
  1. Neutralised and stripped out the affected lower lining.
  2. Cut back to clean transitions, keeping the sound, dry fibre above.
  3. Prepared the shell and installed a new 1260-grade ceramic module lining in the lower section.
  4. Handed over with a completion report. The unit is back in service.
pH indicator strip compared against a colour chart during testing
TestingpH testing on site: the liquid sample measured pH 1.
Edge of the retained ceramic-fibre lining during strip-out, with exposed anchors
Strip-outDamaged fibre cut back to a clean edge of sound lining.
New ceramic modules being installed in the lower section
RelineNew 1260-grade ceramic modules installed on the prepared shell.
Completed lower ceramic module lining meeting the retained upper lining
CompleteNew lower lining meets the retained upper lining.

03 Selected clients

Selected clients and projects.

A selection of the operators, contractors and refractory specialists we've worked for.

ClientSites and scopeYears
LUKOIL-Nizhegorodnefteorgsintez (NORSI)Reference letter — view the redacted copyKstovo, Russia: simultaneous FCCU 1 & 2 turnaround (2018); reactor/regenerator inspection and repairs (2022); Stream 2 waste heat boiler inspection and repairs (2016).2016 – 2022
ENI Sannazzaro refineryReference letter — view the redacted copyPavia, Italy: refractory and anchorage welding on FCCU turnarounds in 2018, 2020, 2021 and 2022, largely with Tecno Refractories, and further work in 2024.2018 – 2024
Phillips 66 Humber RefineryFCCU turnarounds: refractory subcontract for Calderys (2022); refractory inspection for Refractory Inspection Services Ltd (2024).2022, 2024
Saras refineryPurchase orderSarroch, Sardinia: anchorage welders for the regenerator refractory installation, for CRI Enerbility through SMR.2025
Raffineria di MilazzoReference letter — view the redacted copySicily, through SMR: FCCU turnaround inspection and supervision, a two-year inspection contract, and thermal reactor and unit inspections.2019 – 2024
RHI MagnesitaAcceptance certificate — view the redacted copyMain contractor for our LUKOIL NORSI FCCU turnaround work.2018 – 2022
CalderysReference letter — view the redacted copyLUKOIL Kstovo hydrocracker supervision and inspection (2021); Phillips 66 Humber FCCU turnaround (2022).2021 – 2022
LafargeMoldova: complete brick reline of a rotary cement kiln.2021
ADMPurchase orderPurfleet: waste heat boiler and standby boiler repairs and relining. Erith: thermal oxidiser partial reline.2016 – 2026
TOTAL Lindsey Oil Refinery / Altrad–York LiningsReference letter — view the redacted copyLincolnshire: refractory welding on the FCC turnaround, which the client called a huge success.2019
ZampellReference letter — view the redacted copyRefractory and silicon-carbide tile work on boiler water walls at energy-from-waste plants, including Jersey, SUEZ Teesside and Riverside, Belvedere.2020 – 2023
Tecno RefractoriesClient certificate — view the redacted copyENI Sannazzaro: FCCU lining replacement, anchorage welding, and hexmesh in new expansion bellows.2018 – 2023
Pinnacle PowerNottingham biomass plant: refractory removal and replacement.2017 – 2019

04 Project record

Project by project.

Recent work, newest first.

  1. 2026

    Thermal oxidiser partial reline

    Erith, Kent, UK

    Neutralised and stripped out the failed lower ceramic-fibre lining, kept the sound fibre above, and relined the lower section with 1260-grade ceramic modules.

    Purchase order
  2. 2025

    Saras refinery — regenerator anchorage

    Sarroch, Sardinia, Italy

    Anchorage welders for the regenerator refractory installation during the autumn turnaround, for CRI Enerbility through SMR.

    Purchase order
  3. 2024

    Refractory lining support

    Refline Ltd

    Repeat refractory lining support for Refline.

    Reference letter — view the redacted copy
  4. 2019 – 2024

    Raffineria di Milazzo

    Sicily, Italy

    Inspection and installation supervision on the 2019 FCCU turnaround and the 2021 shutdown, then a two-year inspection contract from 2022. Inspected a new thermal reactor at the OCS workshop in 2023, and reported on the hydrogen units, sulphur reactor and boilers in 2024.

    Reference letter — view the redacted copy
  5. 2024

    Phillips 66 Humber — FCCU turnaround

    Lincolnshire, UK

    Refractory inspection for Refractory Inspection Services Ltd. Ron Ramsell was refractory inspector; Andrew Ramsell ran operations.

  6. 2023

    Slavneft refinery — independent inspection

    Yaroslavl, Russia

    Independent inspection of delivered convection heater modules, covering the convection chambers, radiant coil connections and gas pipes, with expert reports, for Refraserv.

  7. 2022

    LUKOIL NORSI — reactor/regenerator repairs

    Kstovo, Russia

    Defect inspection and refractory repairs, September–October 2022, as subcontractor to RHI Vostok Service. Completed to the required quality and on schedule.

    Reference letter — view the redacted copy
  8. 2020 – 2022

    SiC tile systems on boiler water walls

    Energy-from-waste plants, UK & Jersey

    Supervision, anchor layout, welding and installation of silicon-carbide tile protection for Zampell at Jersey, Coventry, Ipswich and Teesside.

    Reference letter — view the redacted copy
  9. 2022

    Phillips 66 Humber — FCCU turnaround

    Lincolnshire, UK

    Refractory subcontract for Calderys. Ron Ramsell managed the project; Andrew Ramsell managed quality and contracts.

  10. 2021

    LUKOIL Kstovo — hydrocracker

    Kstovo, Russia

    Supervision and inspection of the hydrocracker refractory scope for Calderys Italy, led by Andrew Ramsell.

    Reference letter — view the redacted copy
  11. 2019

    TOTAL Lindsey Oil Refinery — FCC turnaround

    Lincolnshire, UK

    Refractory services for Altrad–York Linings, May–August 2019, which the client called a huge success.

    Reference letter — view the redacted copy
  12. 2018

    ENI Sannazzaro & LUKOIL NORSI — FCC turnarounds

    Italy & Russia

    Refractory consultancy, installation, management and supervision on FCCU reactors, regenerators and associated equipment.

    Reference letter — view the redacted copy
  13. 2018

    LUKOIL NORSI — FCCU 1 & 2 turnaround

    Kstovo, Russia

    Supervision and management of the simultaneous turnaround of both FCC units, September–November 2018, for RHI Wostok Service. Andrew Ramsell issued the daily site reports.

    Acceptance certificate — view the redacted copy
  14. 2018

    ENI — spring FCCU shutdown

    Italy

    Refractory lining replacement in the FCCU during the spring maintenance shutdown, for Tecno Refractories.

    Client certificate — view the redacted copy
  15. 2017 – 2018

    Welding and anchorage projects

    UK

    Ron Ramsell's welding team on two projects for FCC Specialist Associated Services, plus welding advice and work for Causeway Steel Products, finished on time.

    Reference letter — view the redacted copy

05 Testimonials

What they said.

I am pleased to highly recommend RCSL and Mr. Ramsell for all refractory consultation and installation services. RCSL were able to deliver quality workmanship safely while conforming to all relevant industrial codes and standards including ASTM and API and material specifications.
Nathan RichardsInspection Engineer, Honeywell UOPENI Sannazzaro & LUKOIL NORSI FCC turnarounds, 2018
Your company proved to be a professional experienced contractor and an effective organizer who fulfilled its contractual obligations and performed the works of the required quality within the scheduled deadlines. The distinctive characteristics of RCSL are flexibility, mobility in solving the assigned tasks, high competence of the employees as well as initiative and efficient response.
A. Yu. BogdanovGeneral Director, LUKOIL-NizhegorodnefteorgsintezReactor/regenerator repairs, 2022
Mr Ramsell did a terrific job at site and was an asset to our project organisation. His communication skills, his work organization, and his positive personality in front of a big challenge ensure that the project was completed in a timely manner while keeping the good morale of the team.
Rien BoerCalderysOn Andrew Ramsell — hydrocracker, Lukoil Kstovo, 2021

06 From site

On site.

Anchorage, brickwork and lined equipment from our jobs. Select a photo to enlarge it.

Start a conversation

Planning a shutdown or chasing a lining problem?

Tell us the equipment, the site and your dates. We'll tell you how we can help and who will do the work.